JTS Governor Pipe Joint(BRASS) Use: Connect cylinder with intake and outlet pipes to control the air volume ,particularly in low volume section ,to adjust the working condition to the best, Maximum pressure:1.0Mpa. Installation:1.Connect rigid pipes,semi-rigid nylon pipes,plastic pipes,Remove the bur and plug the pipe deep to the bottom. 2. When removing the pipe,fix the joint and pull the pipe out . 3. Cut the wear part of the pipe after repeated remove 4. Turn the joint to adiust the direction Model: I Governor pipe joint Nominal passage length Ф10mm Thread ZG3/8” Model: JTS-JTS-Z10(ZG3/8”)